RFQ - City of Harvey - Sibley Boulevard Sidepath and Pedestrian Overpass Project
- SSMMA
- 6 days ago
- 1 min read
Updated: 5 hours ago
Submission Details
The City of Harvey is seeking Statements of Qualification (SOQ) from professional engineering and planning consultants for Phase I Engineering Design of a sidepath and pedestrian overpass along Sibley Boulevard, from Dixie Highway to the Metra 147th/Sibley Station.
Deadline: Submissions must be received by 4:00 PM on October 29, 2025.
Late submissions will not be considered.
All SOQs will be reviewed by the City of Harvey Evaluation Team.
Submission Instructions
Submit hard copies in a sealed envelope clearly labeled:
CITY OF HARVEY, IL SIBLEY BOULEVARD SIDEPATH AND PEDESTRIAN OVERPASS PROJECT
Deliver to:City of Harvey – City Hall15320 Broadway Ave. Harvey, IL 60426
SOQs will be scored and ranked, and the highest-rated firm will be awarded a contract.
Purpose
The purpose of this RFQ is to invite submissions from qualified engineering consultants to provide:
Sidepath design
Pedestrian overpass concepts
Community engagement services
The Phase I Engineering Design will cover a 2.08-mile section of Sibley Boulevard, from Dixie Highway to the Metra 147th/Sibley Station, within Cook County, IL.
Project Overview
This project focuses on the Phase I Engineering Design of a sidepath along Sibley Boulevard (147th Street), a key commercial, residential, and transit corridor in the City of Harvey.
Key components include:
A pedestrian overpass to ensure safe passage for pedestrians and cyclists.
Improved access to the City of Harvey and surrounding south suburban communities.
Integration with regional transportation infrastructure.
The project is funded through the Transportation Alternatives Program, administered by the Chicago Metropolitan Agency for Planning (CMAP).
Download the full RFQ at the link below:
Comments