RFQ - Village of Hazel Crest Construction (Phase III) and Construction Engineering Services for 171st Street Resurfacing Project
- SSMMA
- 12 hours ago
- 1 min read
General: The Village of Hazel Crest (Village) is accepting Qualifications from engineering firms that are prequalified by the Illinois Department of Transportation (IDOT) to provide Construction (Phase III) Engineering Services for the 171st Street Resurfacing project.
Project Description: The 171st Street Resurfacing project involves hot-mix asphalt surface removal and replacement with polymerized leveling binder and hot-mix asphalt surface course, spot curb and gutter removal and replacement, driveway, sidewalk, ADA detectable warnings removal and replacement, where necessary, and thermoplastic striping. The project limits are from California Ave to Western Avenue.
The project is being funded through a combination of Surface Transportation Program (STP) and Local funds and must adhere to all Village, State and Federal requirements. The Village expects the Preliminary Engineering to start as soon as possible and is hopeful to make a spring 2026 IDOT letting. The Village is hoping to begin construction in late fall 2025. The construction budget for this project was estimated at $341,758.
Download the complete RFQ below.
Comments