• SSMMA

Request for Proposals for Millennium Reserve Calumet River Corridor Green Infrastructure project


green-infrastructure-4 (1)

Sites can be viewed on our GIS Atlas here. Select “Cancel” when the password prompt appears, then click on the “Green Infrastructure Sites” layer from the table of contents on the left. Or, view the Green Infrastructure Sites GIS shapefile here.

Timeline: January 27, 2014 by 4 p.m. – Proposals due Late January, 2014 – Interview consultants (if necessary) February, 2014 – Award contract

0 views0 comments